How an RMn becomes a release. Stated by the maintainer on 2026-09-25, because the implicit version of this had stopped working. The triage runbook (CONSUMER_TRIAGE_LOOP.md) and the roadmap files follow this page; where one of them disagrees, this page is newer.

Seats

Work runs in two or more Claude Code sessions, each with one purpose:

  • the triage seat, unattended, which turns inbound Sn into replies and RMn;
  • the interactive coding seat, which works with the maintainer.

A seat does not take another seat's work or offer to.

How an item gets its version

  1. Triage files the item as open.
  2. Its release is decided by omission. Every patch-class item that is not blocked goes into the next patch batch on main by default, and nobody asks.
  3. An item with an undecided part gets an interview with the maintainer before a version is assigned to it. Legality under the Constitution still sizes the release; the interview settles the design question, not the class.

Closing an item

An entry that moves to ROADMAP_HISTORY.md states what it did not fix, in one **Residuals** paragraph after its Status/Owner/Motivating block:

**Residuals** none
**Residuals** RM272 · won't fix — the beta endpoint 301s and answers no bare rsID

Items are separated by ·. Each one is an RMn or won't fix — <reason>, and nothing else:

  • An RMn counts only if that item's own entry mentions this one, by number or by this entry's motivating Sn. File the residual first, with .claude/rm-next.py, and write the back-reference into it. Pointing at an item that is merely open is not enough, and pointing at one that is closed never was. RM38 pointed at RM27 and RM50's tracker line pointed at RM50; both targets closed without a word about what pointed at them.
  • An idea-book bullet, a parked list, a probe, a code comment or a reference doc is not a home. RM31's residual pointed at the parked "enricher co-authoring" bullet and at a workaround no consumer document carried, and a defect nobody chose to leave went unowned for three minors.
  • "Filed" means an RMn in the same sentence. RM192 said "filed rather than improvised" and filed nothing.
  • won't fix needs a reason of at least five words, and beyond that it is reviewed prose. Decided 2026-09-27: a longer minimum, or a required citation, would make the escape hatch cost more than filing the RM and push authors toward vaguer residuals rather than none.

schema/tests/test_closure_residuals.py enforces this. Entries closed before the rule are listed in schema/tests/data/residuals_legacy.txt, which is asserted exact, so it can only shrink: give a legacy entry its line and delete it from the list in the same commit. The why is POSTMORTEM_2026_09_27.md.

A cut rewrites the lead paragraph of every CHANGELOG heading that names its version, to say it was cut and tagged. A reply never cites a heading as the record of a state that will change; it cites the tag. The 0.7.0 heading said "being built … not yet cut" for a month after v0.7.0, while six replies (S75–S80) pointed consumers at it. test_closure_residuals.py refuses a present-tense uncut claim under any version that has a release record or is older than the newest versioned heading.

Patches

Patches are built and cut on main. A patch carries however many fixes the latest wave of usage produced; there is no count to reach. Patches keep coming until the minor roadmap holds enough to be worth doing.

A commit on main is patch scope only. Anything that sizes as a minor under Principle 3 (a new field, table, public function, method or CLI surface) never lands on main, not even uncut: it goes on the open minor branch (0.8 today), or it is filed and waits for one. Everything on main must be cuttable as a patch at any moment, because the next patch is cut from whatever main holds.

This was implicit until 2026-09-25 and broke the day before: the triage seat committed RM256, RM257, RM259, RM260 and RM262 to main as "shipped, uncut, sizes as a minor", which left main unable to cut a patch. 0.7.2 then had to be cut off a revived 0.7 branch, and RM264 had no line to ship on. main was rebuilt from v0.7.2 with the patch-scope commits only, and the five moved to the 0.8 branch.

One number per cut (from v0.7.4). A cut's tag names the release, vX.Y.Z, and every package that changed since the previous tag takes that same number, skipping whatever its own line never used; a package that did not change keeps its version and is not built. Every intra-workspace floor names its dependency's current version, as test_workspace_versions already requires: the release number for a dependency that moved in this cut, its old version for one that did not. Worked example: after v0.7.3 (format 0.7.1, compiler 0.7.2, enricher 0.7.3), a cut changing format and enricher is v0.7.4 with format 0.7.4, enricher 0.7.4, compiler staying 0.7.2, and enricher's floors format>=0.7.4, compiler>=0.7.2. A skipped number is legal SemVer and legal on PyPI. The gain is that the tag and every moved package say one number, so "which versions are in this release" has one answer. v0.7.3 was the last cut that bumped each package by one on its own line (format 0.7.1, compiler 0.7.2, enricher 0.7.3), already published when the rule was set on 2026-09-27.

The item counts in the triage runbook's §4 are a "worth doing" lamp, not a start pistol. They are reported, never asked about, and they never freeze scope.

Minors

  1. Interview on the planned items: some are deferred, some go into scope.
  2. Proposal: a plan with detailed implementation notes per item and every decision already made, so the build can run without asking.
  3. Branch, then batch implementation, mostly unattended.
  4. Second pass: items that emerge during implementation join the same release automatically, unless they need a major.
  5. Review wave and dogfooding wave. What they find becomes new items, interviewed on their decisions and implemented. Repeat until a review comes back clean. The triage seat monitors the branch meanwhile and processes whatever arrived during the build.
  6. Downstream pre-integration: the consumer repos try the unreleased version (a second level of dogfooding). Their suggestions become items and the cycle returns to step 5, now also needing the pre-integrations to confirm.
  7. At zero active items, the release is tagged and cut.

The failure this sequence guards against is an urgently needed feature pushed into a release that has not been cut yet. It resets the cycle, and in earlier lines it produced the PROPOSAL_*_PT2/PT3 rounds and branches of around 400 commits that were hard to follow and maintain.

Tic/tac after 1.0 (intended, not yet in force)

From 1.0 on, the intent is to alternate: even minors are bugfix and stabilization only, odd minors carry new features, each with its own deferrals. It does not apply before 1.0, because feature parity with competitors is needed now and moving it out of 0.8 would stall it. So 0.8 stays as its roadmap file declares it: stabilization and competitor parity.

Majors

Roughly as minors. None has been done yet, so the differences are not known.